Professional Parts, Plastic and Metal/ Aluminium Parts Machining/ Machining Parts
Production Flowing:
1-Start from part design analysis
2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making
3-If product is complex,moldflow report will be present as well
4-In house mold making shop ensure you mold quality under well control.
5-Normally it takes 15-30 days to make mold,precise time depends on part design
What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.