Item | Type | Description |
1 | Material remove Process | Mechanical: *Single-point cutting :Turning Planing and shaping) *Multi-point cutting :§ Milling Drilling Broaching Sawing *Abrasive machining :Grinding Honing Lapping Ultrasonic machining Abrasive jet machining |
2 | Chemical: Chemical machining Electrochemical machining (ECM) | |
3 | Thermal: Torch cutting Electrical discharge machining (EDM) | |
4 | Surface finish | Anodizing ,Heat treatment, polishing, powder coating, galvanized, electroplating, spraying, and painting |
6 | Dimensions Tolerance | ±0.02mm, as for semiconductor and medical ,the mechinery accuracy can achieve ±0.008m |
7 | Drawing Format | PDF/JPEG/AI/PSD/CAD/Dwg/Step/LGS |
8 | Quality AQL | 0.65/1.0 |
10 | Main manufactory Faciliies | 3-, 4-Axis CNC Milling and Turning,,Mirror EDM, lathe, Grinding machine,wire cutting machine,FSW, CMM, reflow welding |
11 | Testing Facilies | CMM, Projector, Salt Spray Tester, Durometer, Airtightness tester,Helium leak detector |
12 | Heat pipe temperature rise detection tank,AMCA210 Wind tunnel tester,High and low temperature shock tester,Qmax tester | |
13 | Application | Data center, Telecom& Net working, PC& Graphic Card, Gaming console, Electric Vechicles, Military, Auto Machine, Medical, Home appliance and other application |
14 | MOQ | negotiable |
15 | Packaging | PE bags or bubble bags, boxes, cartons, pallet or as per customers' requirements |
16 | Delivery Terms | EXW, FOB, CIF,FCA.C&F. DAP. |
17 | Payment Terms | Paypal or Western Union forgolden sample orders; mass product by T/T with 30% down paymen t, 70% before shipment or irrevocable documentary letter of credit |
18 | Leadtime | Within 30 working days after payment received for finished goods. If the product need use tooling, the leadetime will be 2 months. |
19 | Loading ports | FOB Shenzhen(recommended), or Hong Kong |